Hydra Power Solutions Pty Ltd
5 Campbell Street, Tomago NSW 2322 · 1800 173 178 · info@hydrapowersolutions.com.au
ABN 62 631 448 207
Quotation
Q-26-0156
Date 20 Jul 2026
Valid until 19 Aug 2026
Lead time 15 weeks
Prepared by Sam Whitaker
Customer
Bowen Basin Dewatering Pty Ltd
Attn: Shane Keogh
Site: Moranbah yard
8 Mill Street Moranbah QLD 4744
ABN 29 618 774 330
Dewatering pumpset overhauls — 6 × Flygt 2640
Pricing
| Item | Qty | Unit ex GST | Amount |
| Level control | $1,881.60 |
| EH-FTL-FLOAT · Level float switch, PP, 10 m cable | 6 ea | $313.60 | $1,881.60 |
| Labour | $43,460.00 |
| Strip, inspect, rebuild & test 6 pumps | 340 hr | $115.00 | $39,100.00 |
| Collection & return | 20 hr | $125.00 | $2,500.00 |
| Project management | 12 hr | $155.00 | $1,860.00 |
| Other | $20,600.00 |
| Flygt overhaul kits — seals, bearings, wear rings (6) | 1 lot | $16,800.00 | $16,800.00 |
| Road freight Moranbah return | 1 lot | $3,800.00 | $3,800.00 |
Exclusions
Civil works, concrete plinths and trenching unless listed. Supply authority fees. Works outside normal hours unless agreed.
Acceptance
To accept, sign below and return with your purchase order, or accept online using the link in our email.
Name: ______________________ Signature: ______________________ Date: ____________ PO number: ______________
Regards,
Sam Whitaker · Hydra Power Solutions Pty Ltd · 1800 173 178
| Subtotal (ex GST) | $65,941.60 |
| GST 10% | $6,594.16 |
| Total (inc GST) | $72,535.76 |
Prices are in Australian dollars and exclude GST unless shown. Payment terms: 30 days EOM from invoice, progress claims monthly against the stages of the job.
Power · Custom control systems · Pumping