Portable switchroom — Pit 4 dewatering

Job moneyex GST · labour at internal rates · committed = ordered, not yet received
Revenue
Quoted contract$203,783.54
Approved variations$14,200.00
Revised contract$217,983.54
Claims & cash
Claimed to date$205,756.52
Invoiced$195,468.70
Paid$152,877.95
Remaining to claim$12,227.02
Cost — budget vs actual
Labour 436.8 of 366 h$27,771 / $28,540
Materials received$65,715
Open purchase commitments$0
Materials budget (incl. variations)$75,615
Other allowance (subcontract, freight, hire)$64,100
Forecast cost at completion$168,255
Expected margin
22.8%
$49,729
Quoted at 22.3%
Cost to date $93,486 · 119% of labour hours used
Due 13 Nov 2026

Stages

Stage values $203,784 = contract
#StageContract valueDueStatusResponsible
1 Design & drawings $20,378.35 12 Aug 2026 Complete Daniel Reeves
2 Equipment procurement $71,324.24 04 Sep 2026 Not started Daniel Reeves
3 Assembly & wiring $61,135.06 28 Sep 2026 Complete Daniel Reeves
4 FAT & testing $30,567.53 21 Oct 2026 Not started Daniel Reeves
5 Delivery & commissioning $20,378.36 13 Nov 2026 In progress Daniel Reeves
TaskWhereStagePersonStartFinishEst hBooked h%Status
Drawings & IFC approval Office Design & drawings Amy Tran 03 Aug 2026 10 Aug 2026 33 43.7 100 Complete
Enclosure prep & mounting Workshop Assembly & wiring Josh Bell 17 Aug 2026 25 Aug 2026 42 52 100 Complete
Mount & power wiring Workshop Assembly & wiring Tyler Nguyen 26 Aug 2026 21 Sep 2026 96 133.25 100 Complete
Control wiring & PLC Workshop Assembly & wiring Ben Adams 10 Sep 2026 06 Oct 2026 96 135.3 100 Complete
FAT & testing Workshop Delivery & commissioning Luke Harding 09 Oct 2026 20 Oct 2026 42 51.3 100 Complete
Delivery & commissioning Site Delivery & commissioning Chris Walsh 28 Oct 2026 12 Nov 2026 58 21.2 50 In production

Components

To order 0On order 0Arrived 37
Order outstanding
PartDescriptionQtyStockOrderedReceivedTo orderETAPONeeded forStatus
CBL-95-4C Cable 95 mm² 4C+E XLPE/PVC 0.6/1 kV 60 0 60 60 0 — PO-26-0313 Enclosure prep & mounting Arrived
CBL-GLAND-M63 Cable gland kit M63, brass, c/w locknut 12 0 12 12 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-DIN-35 DIN rail 35 mm top-hat, 2 m length 8 0 8 8 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-DUCT-60 Slotted cable duct 60 × 60, 2 m 14 0 14 14 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-EARTH12 Copper earth bar, 12-way 2 0 2 2 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-FAN-150 Filter fan 230 V 150 m³/h c/w exhaust filter 4 0 4 4 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-FERR Bootlace ferrule kit, assorted 1 0 1 1 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-HEATER Anti-condensation heater 100 W 2 0 2 2 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-LIGHT Panel LED light c/w door switch 2 0 2 2 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-LUG-95 Compression lug 95 mm², pack of 10 2 0 2 2 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-TB-4 Terminal block 4 mm², box of 50 4 0 4 4 0 — PO-26-0313 Enclosure prep & mounting Arrived
RX-THERMO Enclosure thermostat / hygrostat 2 0 2 2 0 — PO-26-0313 Enclosure prep & mounting Arrived
RIT-PLINTH-1200 VX25 plinth 100 mm, 1200 W 2 0 2 2 0 — PO-26-0318 Enclosure prep & mounting Arrived
RIT-VX-1812 Rittal VX25 freestanding 1800H × 1200W × 500D, 2-door 2 0 2 2 0 — PO-26-0318 Enclosure prep & mounting Arrived
SE-ESW-8 Unmanaged industrial Ethernet switch, 8-port 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-HMIST6-7 Harmony ST6 7" touch HMI, Ethernet 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-PSU-24-10 24 VDC 10 A switch-mode power supply 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-TM241 Schneider Modicon M241 PLC, 24 I/O, Ethernet + CANopen 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-TM3AI4 Modicon TM3 4-channel analogue input module 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-TM3AQ2 Modicon TM3 2-channel analogue output module 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-TM3DI16 Modicon TM3 16-channel digital input module 2 0 2 2 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-TM3DQ16R Modicon TM3 16-channel relay output module 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
SE-UPS-24 24 VDC DC-UPS module c/w 7 Ah battery 1 0 1 1 0 — PO-26-0315 Enclosure prep & mounting Arrived
NHP-AMM-96 Analogue ammeter 96 mm c/w CT 4 0 4 4 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-MCB-6 MCB 1P 6 A C-curve, 6 kA 6 0 6 6 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-MCCB-160 NHP 160 A 3P MCCB, 36 kA 2 0 2 2 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-MCCB-250 NHP 250 A 3P MCCB, 36 kA, electronic trip 2 0 2 2 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-MCCB-400 NHP 400 A 3P main switch-disconnector, 50 kA 2 0 2 2 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-PL-LED LED pilot light 24 V (red / green / amber) 12 0 12 12 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-RLY-24 Control relay 24 VDC 4 C/O c/w base 22 0 22 22 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-SEL-HOA Hand-Off-Auto 3-position selector switch 4 0 4 4 0 — PO-26-0320 Enclosure prep & mounting Arrived
NHP-SPD-3P Surge protection device 3P+N, 40 kA 1 0 1 1 0 — PO-26-0320 Enclosure prep & mounting Arrived
ABB-ACS580-37 ABB ACS580-01-073A-4 VSD 37 kW IP21 2 0 2 2 0 — PO-26-0311 Enclosure prep & mounting Arrived
ABB-ACS580-75 ABB ACS580-01-145A-4 VSD 75 kW IP21 2 0 2 2 0 — PO-26-0311 Enclosure prep & mounting Arrived
ABB-EMC-145 EMC/RFI filter 145 A 2 0 2 2 0 — PO-26-0311 Enclosure prep & mounting Arrived
ABB-LR-073 Line reactor 73 A, 3-phase 2 0 2 2 0 — PO-26-0311 Enclosure prep & mounting Arrived
ABB-LR-145 Line reactor 145 A, 3-phase 2 0 2 2 0 — PO-26-0311 Enclosure prep & mounting Arrived

Variations

Approved $14,200 · pending $0 — only approved variations are claimed
No.VariationValueEst. costRaisedCustomer refApproved byStatus
V-01 Additional MCC tier — 2 × DOL starters for sump pumps $14,200.00 $9,900.00 20 Aug 2026 RRM-VAR-07 Hamish Doyle (Ravensworth) Approved

Drawings & documents

Doc no.TitleTypeRevUploadedByKB
Nothing here yet — use “Upload document” to create the first one.

Time booked

Timesheets →
PersonHoursCost
Ben Adams135.3$5,141
Ryan Cole67.75$4,878
Tyler Nguyen65.5$4,716
Josh Bell52$3,640
Luke Harding51.3$4,207
Amy Tran43.7$3,409
Chris Walsh21.2$1,781
TaskEst hBooked hCostLast
Drawings & IFC approval3343.7$3,40910 Aug
Enclosure prep & mounting4252$3,64025 Aug
Mount & power wiring96133.25$9,59421 Sep
Control wiring & PLC96135.3$5,1416 Oct
FAT & testing4251.3$4,20720 Oct
Delivery & commissioning5821.2$1,7813 Nov

Progress claims

ClaimPeriod toClaimed to datePreviousThis claimInvoiceStatus