Quote detailsDeclined
Newcastle Waste & Recycling Pty Ltd · 30 days EOM
Lines
| Item | Qty | Unit cost | Markup | Unit sell | Line ex GST | GM | |
|---|---|---|---|---|---|---|---|
| DOL pump starter — up to 15 kW × 2 | |||||||
| NHP-MPCB-32 Components Motor protection circuit breaker 25–32 A | ea | % | $529.20 | 25.9% | |||
| NHP-CTR-40 Components AC3 40 A contactor, 24 VDC coil | ea | % | $453.60 | 25.9% | |||
| NHP-SEL-HOA Components Hand-Off-Auto 3-position selector switch | ea | % | $140.40 | 25.9% | |||
| NHP-PL-LED Components LED pilot light 24 V (red / green / amber) | ea | % | $210.60 | 25.9% | |||
| NHP-RLY-24 Components Control relay 24 VDC 4 C/O c/w base | ea | % | $183.60 | 25.9% | |||
| RX-TB-4 Components Terminal block 4 mm², box of 50 | ea | % | $179.80 | 31% | |||
| RX-DIN-35 Components DIN rail 35 mm top-hat, 2 m length | ea | % | $27.56 | 31.1% | |||
| Equipment & components | |||||||
| SE-TM241 Components Schneider Modicon M241 PLC, 24 I/O, Ethernet + CANopen | ea | % | $1,612.00 | 23.1% | |||
| RIT-SS316-1210 Equipment 316 stainless enclosure 1200 × 1000 × 400, IP66 | ea | % | $4,225.00 | 23.1% | |||
| Labour | |||||||
| hr | % | $4,140.00 | 37.4% | ||||
| hr | % | $1,500.00 | 36% | ||||
Equipment $4,225.00Components $3,336.76Labour $5,640.00Labour hours 48
| Subtotal ex GST | $13,201.76 |
| GST 10% | $1,320.18 |
| Total inc GST | $14,521.94 |
| Cost | $9,309.00 |
| Gross margin | $3,892.76 · 29.5% |